EMAProject Management & Disaster Recovery

EMA Project Management & Disaster Recovery

One Project. One Record. One Place.

60 days free · Full premium access · No card required

From the first damage assessment to the final report, bring your recovery projects, field documentation, and team together in one place.

$79/month after your free trial.

Includes three management users and unlimited worker time entry.

Field professional documenting storm damage with a tablet
See the app in action

About the App

EMA brings field documentation, project management, cost tracking and disaster recovery together in one place.

Capture damage, GPS locations, photos and dimensions. Track force account labor, contractors, equipment, debris and costs. Organize documentation, use built-in recovery calculators, connect Damage Inventory to projects, and generate reports—all while the work is happening.

Built for the field. Organized for the office. Ready for recovery.

Project Tracking

Track debris removal, emergency work, roads, buildings, utilities, and parks on any project — with built-in Categories A–G and Z support, GPS mapping, and load-ticket documentation.

Labor & Time Tracking

Clock in/out for force-account employees and contractors, with automatic straight-time and overtime calculation tied to each damaged facility.

Ready-to-Submit Reporting

Generate professional PDF project reports and cost-tracking CSVs for any workflow — including FEMA-ready submissions and Hazard Mitigation (Appendix J) proposals.

Choose Your Recovery Plan

Start with the app, or get guided support from Emergency Management Assistant.

EMA Ready

Basic App

$79/month

Three management users included — project manager, primary contact and secondary contact. Worker and contractor time-entry accounts are unlimited.

  • ✓60-day free trial — full premium, no card required
  • ✓Project & damage inventory tracking
  • ✓Categories A–G and Z
  • ✓GPS mapping & load tickets
  • ✓Unlimited force-account & contractor time entry
  • ✓PDF / CSV reporting
  • ✓Additional management users $10/mo each

EMA Response

App + Workbook

Pricing by consultation

For applicants who want EMA’s tools plus limited, agreed-upon guidance.

  • ✓Everything in EMA Ready
  • ✓Cost Summary Workbook
  • ✓Consultant assistance for a defined scope of work

EMA Recovery

Guided Support

Pricing by consultation

For applicants who want ongoing, hands-on help managing recovery documentation.

  • ✓Everything in EMA Response
  • ✓Ongoing guidance as recovery progresses
  • ✓Help organizing documentation, tracking work and costs, and preparing reports

EMA Resilience

Recovery Partner

Pricing by consultation

App, workbook, and a tailored consultant engagement.

  • ✓Everything in EMA Recovery
  • ✓Tailored consultant engagement

Emergency Management Assistant provides comprehensive support, remotely or on site, tailored to your needs. Contact us by email or phone to discuss how we can assist you.

Cost Summary Workbook

Your Public Assistance Project Workbook, filled in automatically from the app's project records. One-time purchase — buy once, keep it. Purchased separately; it does not include app access.

$99Up to 3 projectsFor a single disaster with up to three projects.
$179Unlimited projectsFor recovery work across any number of projects.

Try EMA Ready free for 60 days — full premium access, no credit card required. Continue for $79 per month for three management users (project manager, primary contact and secondary contact), with unlimited worker and contractor time entry. Additional management users are $10 per month each.

Free Project Calculators

Estimate materials, debris, and costs for any recovery or construction project

Volume (cu ft): 201.06
Volume (cu yd): 7.45
Est. weight (lb): 7,446.74
Est. weight (ton): 3.72

Uses trunk cylinder volume × 1.6 canopy factor. Densities: softwood 800 lb/cy, hardwood 1,100 lb/cy, mixed 1,000 lb/cy (green weight).

Volume (cu ft): 10,000
Volume (cu yd): 370.37
Est. weight (ton): 185.19
Dumpsters needed: 13

Density: vegetative 500 lb/cy, construction 1,000 lb/cy, white goods 250 lb/cy (compacted).

Coverage (sq ft): 400
Volume (cu ft): 66.67
Volume (cu yd): 2.47
Est. amount (lb): 5,950.62
Est. amount (ton): 2.98
+15% compaction (ton): 3.42

Density of Rip Rap (6–12"): 2,410 lb/yd³ (1.21 t/yd³).

Volume (cu ft): 33.33
Volume (cu yd): 1.23
60 lb bags: 75
80 lb bags: 56

Ready-mix in cubic yards, or bag count (60 lb = 0.45 cu ft, 80 lb = 0.6 cu ft).

Coverage (sq ft): 200
Volume (cu yd): 1.23
Est. weight (lb): 4,833.33
Est. weight (ton): 2.42

Asphalt hot mix density: ~145 lb/cu ft (3,915 lb/cu yd).

Wall area: 352 sq ft
Ceiling area: 120 sq ft
Openings deducted: 51 sq ft
Net area: 421 sq ft
Total w/ waste: 463.1 sq ft
Sheets needed: 15

Shopping List

  • • 15 sheets of 4' × 8' drywall (10% waste)
  • • 14 × 5-gal buckets of all-purpose compound (3 coats)
  • • 4 × 75-ft rolls of paper tape (with corners)
  • • 1 × 5-lb boxes of screws (16" OC)